How to Calculate Stones, Crates, and Pallets for Walkways
When constructing a natural stone walkway or garden path, stones are often supplied in bulk crates or wire-tied pallets containing a fixed piece count or square footage. The crate formula is: Crates Needed = Total Stones Needed / Stones Per Crate.
Worked Example: If a project requires 2,000 stones and each crate contains 50 stones: 2,000 ÷ 50 = 40 crates. For bed prep under stones, calculate required bedding aggregate with our Sand Calculator.

