# 2027 Mass Timber Procurement Checklist

- Link: https://www.qtywise.com/blog/mass-timber-procurement-checklist/
- Published: 2026-10-13T06:22:14-04:00
- Author: Jamie C.

## Mass timber procurement priorities

Core Rule of Thumb: Release fabrication and delivery against coordinated drawings
and a documented handoff plan.

Standard Formula: Rectangular timber volume equals thickness multiplied by width,
length and piece count.

Quick Estimate Range: No universal moisture limit, panel tolerance or delivery allowance;
use project and manufacturer requirements.

Recommended Qtywise Tool: [Board Foot Calculator](https://www.qtywise.com/framing-lumber-stairs/board-foot-calculator/)
for a geometric volume check.

A mass timber procurement checklist should confirm the approved panel schedule, 
moisture protection, transport and lifting access, interface tolerances, and responsibility
for every delivery handoff. Agree on these items before fabrication release. A volume
tally supports procurement, but does not establish structural capacity, lifting 
safety or the price of a fabricated panel package.

This 2027 planning checklist uses guidance available at publication. It makes no
prediction about future prices, product approvals or code changes. Verify the current
manufacturer documentation and locally applicable requirements when placing the 
actual order. The technical sources below principally address North American projects;
their details do not automatically establish UK or European compliance.

## Confirm the mass timber procurement scope

Mass timber procurement starts with a coordinated component schedule. Identify whether
the package includes cross-laminated timber panels, glued laminated beams, columns,
connectors, factory machining, coatings or transport protection. Record the dimensions
and product identity of each component rather than treating all wood volume as interchangeable
stock.

Keep the approved drawing revision beside the supplier quotation and fabrication
release. Ask how openings, connection recesses and edge details affect the package.
A quote for rectangular blanks may differ substantially in scope from a quote for
machined and protected components.

The WoodWorks Mass [Timber Connections Index](https://www.woodworks.org/wp-content/uploads/wood_solution_paper_Mass_Timber_Connections_Index_06.2024.pdf)
explains that suppliers have different fabrication capabilities and preferences 
for connection geometry. Consult the selected supplier about the reviewed details
before assuming another manufacturer’s solution is transferable.

Use the [Board Foot Calculator](https://www.qtywise.com/framing-lumber-stairs/board-foot-calculator/)
to compare entered rectangular dimensions, with a clear note on whether the tally
represents gross blanks or finished component geometry. It cannot turn a volume 
into an approved structural substitution.

## Document moisture protection and acceptance

A mass timber moisture plan defines protection, monitoring, response and acceptance
for the actual construction sequence. Ask who prepares it, who reviews it and which
measurements must be recorded before delivery, installation and covering.

WoodWorks’ Mass [Timber Moisture Management](https://www.woodworks.org/resources/mass-timber-moisture-management-for-construction/)
for Construction identifies trapped moisture and water exposure at edges, joints
and interfaces as risks. Its guidance calls for project-specific protection and 
monitoring rather than relying on one generic plan.

### Acceptance documents and moisture records

The purchasing documents should identify the required condition at handoff and the
process for handling a nonconforming delivery. Request the approved measurement 
method, instrument requirements, locations and reporting format. Record product 
identifiers so a moisture observation remains attached to the correct panel.

Use the project-specific acceptance limits. The designer and manufacturer need to
state the limits relevant to the product, protection system and stage of construction.
Ask how those limits will be verified at sensitive interfaces, where a surface observation
may not describe concealed moisture.

#### Release before covering

Include responsibility for drying, further assessment and release before covering.
A delivery signature should identify what was checked and what remains unresolved;
it should not imply that every concealed condition has been accepted.

## Plan transport, access and lifting before dispatch

Delivery planning connects panel dimensions with the usable route and installation
sequence. Record vehicle access, overhead restrictions, unloading position and where
the next panel will be installed. Coordinate the supplier’s load order with the 
installer so the first needed components are accessible.

### Lifting information and equipment selection

Request verified component weights and the approved lifting information. A geometric
volume estimate cannot establish lift weight without appropriate product data, and
even a correct weight does not select a safe crane or rigging arrangement. The qualified
lifting team must assess the actual equipment configuration and site conditions.

Measure the route using the proposed vehicle and equipment requirements. Note turn
restrictions, delivery windows and areas that must remain available for other trades.
Ask who confirms the route is ready before a loaded vehicle leaves the factory.

If storage is unavoidable, identify the approved support arrangement, protection
and monitoring responsibilities. The moisture plan should cover the period between
arrival and installation. Resolve a delayed unloading scenario in advance rather
than assuming the factory wrapping provides indefinite site protection.

## Coordinate tolerances at concrete and steel interfaces

A tolerance is an allowed dimensional variation within a specified context. Record
manufacturing, fabrication and installed-interface requirements separately. A precise
factory panel can still encounter a base or connector position that differs from
the coordinated design.

The WoodWorks design and [cost optimization checklists](https://www.woodworks.org/wp-content/uploads/wood_solution_paper-Mass-Timber-Design-Cost-Optimization-Checklists-05.2023.pdf)
call for coordination of base-level tolerances with the contractor, foundation subcontractor
and timber manufacturer or designer. That discussion belongs before fabrication 
and installation commitments are finalized.

Ask for the agreed survey information needed to release the package. Record bearing
elevations, connection positions and the date of the survey. Confirm who checks 
the information against shop drawings and how unresolved deviations affect fabrication
release.

Do not prescribe a standard gap or site-cutting allowance without the approved details.
If the interface differs from the drawing, use the documented request-for-information
process. A volume calculator cannot approve trimming, drilling or altering a load-
bearing component to make it fit.

Include the authority to approve an adjustment and its effect on connections, fire
protection and adjacent assemblies. Keep the final accepted revision in the handoff
record so the installed solution remains traceable.

## Reconcile rectangular volume with the quoted quantity

Board feet describe volume. One board foot equals 144 cubic inches, or one-twelfth
of a cubic foot. When thickness and width are in inches and length is in feet, multiply
those three dimensions and piece count, then divide by 12.

    ```wp-block-code
    board_feet = thickness_in * width_in * length_ft * pieces / 12
    ```

### Gross blank volume example

Consider eight hypothetical rectangular timber blanks, each 6 in thick, 48 in wide
and 12 ft long. These are illustration dimensions, not a recommended panel product.
The tally is 6 × 48 × 12 × 8 ÷ 12 = 2,304 BF.

#### Independent cubic-foot and metric checks

An independent cubic-foot check gives (6 ÷ 12) × (48 ÷ 12) × 12 × 8 = 192 ft³. Multiplying
by 12 reproduces 2,304 BF. Using the exact international foot definition, the gross
volume is 5.436834545664 m³, displayed as 5.437 m³ after rounding.

| Quantity | US customary value | Metric equivalent | 
| Thickness | 6 in | 152.4 mm | 
| Width | 48 in | 1,219.2 mm | 
| Length | 12 ft | 3.6576 m | 
| Total gross volume | 192 ft³ | 5.436834545664 m³ |

Hypothetical gross rectangular blanks; openings and fabrication losses are excluded

Reproduce the blank schedule in the [timber volume worksheet](https://www.qtywise.com/framing-lumber-stairs/board-foot-calculator/).
Confirm whether the supplier invoices gross stock, finished parts, panel area or
a complete fabricated package. Deducting openings from geometric volume does not
necessarily deduct the same amount from the invoice.

## Mass timber procurement handoffs and responsibilities

| Handoff | Evidence to request | Responsibility to identify | 
| Fabrication release | Approved revision and resolved openings | Designer and manufacturer | 
| Dispatch | Load list, protection and delivery sequence | Supplier and logistics coordinator | 
| Arrival | Identifiers, condition and required moisture records | Receiving team | 
| Installation | Approved lifting and interface records | Installer and qualified lifting team | 
| Before covering | Moisture acceptance and unresolved-condition register | Responsible reviewer named in the plan |

Suggested procurement record; project-specific approval remains with the responsible
team

Use an exception column in the actual project record. Note missing information, 
damaged protection or an unresolved interface rather than marking the entire package
accepted. Assign the next action and obtain the required approval before the affected
work proceeds.

## Compare mass timber procurement costs and local requirements

Compare quotations with equivalent inclusions. List fabrication, connectors, transport,
storage, protection, survey coordination and installation separately where they 
are outside the package. Ask whether revision work, waiting time or a repeat delivery
changes the price.

Use dated supplier quotations in the project’s currency and market. A price per 
board foot can support a material-only scenario when that is genuinely the quotation
basis. It cannot represent the complete installed cost without the remaining scope.

For a 2027 order, check product documentation and adopted local requirements again
at release. Obtain professional approval where structural, fire or lifting judgment
is involved. A procurement checklist organizes the evidence; the responsible project
team determines whether the package is acceptable.

Enter the confirmed rectangular dimensions and piece count in the [Board Foot Calculator](https://www.qtywise.com/framing-lumber-stairs/board-foot-calculator/).
Keep gross volume, supplier billing basis and approved structural specifications
distinct.

## Documents for mass timber procurement release

 * Coordinated component schedule and approved shop-drawing revision.
 * Moisture plan, acceptance records and responsibility for protection.
 * Verified delivery information and approved lifting arrangements.
 * Interface survey and authorized response to deviations.
 * Supplier billing basis and full inclusions in the dated quotation.

## Sources

 * WoodWorks, Mass [Timber Moisture Management](https://www.woodworks.org/resources/mass-timber-moisture-management-for-construction/)
   for Construction.
 * WoodWorks, Mass [Timber Connections Index](https://www.woodworks.org/wp-content/uploads/wood_solution_paper_Mass_Timber_Connections_Index_06.2024.pdf),
   June 2024.
 * WoodWorks, Mass Timber Design and [Cost Optimization Checklists](https://www.woodworks.org/wp-content/uploads/wood_solution_paper-Mass-Timber-Design-Cost-Optimization-Checklists-05.2023.pdf),
   May 2023.